Concretetestinggetsmessyfast

Concrete Cube Test Record
Unclear paperwork
Slow reporting
Endless follow-up calls
Scattered messages
Disconnected spreadsheets
No clear status
WhatsApp notification
WhatsApp notification
Email notification
Incoming call notification

Concrete's Hard Enough.

Managing It Should Be Simple.

Specimens, cube results, reports and clients. One calm system for the concrete lab.

Book a demo

Introducing

Simplecrete Solutions

Your whole lab.One screen.

What is due, what is overdue and what is ready to publish, across every client and every site.

Simplecrete operations dashboard on a tablet

How it works

From cube to client, without retyping a thing.

01

Scan the paperwork.

Photograph the delivery sheet. Simplecrete reads the handwriting, fills in the job and prints a QR label for every cube.

Specimen Capture · MR24187OCR extracted
Scanned cube test paperwork
Client paperwork
Client
ABC Construction
Project
Block C · Level 2 slab
Concrete class
30 MPa / 19 mm
Date cast
29 Sep
Specimens
6 × 150 mm cubes
Slump
85 mm
Approve & print QR labels
02

Test in seconds.

Scan the label, enter the mass and the crushing load. Strength and pass or fail are worked out for you.

Cube TestingLabel scanned
Scanned label
MR24187-S03
Mass
8.12 kg
Max load
742.5 kN
Compressive strength
33.0 MPa
Above 7-day target
7 days33.0 MPaTested
14 daysDue 13 OctScheduled
28 daysDue 27 OctScheduled
03

Approve the report.

Results flow into a report with your logo and colours, reviewed and signed off in a few clicks.

Report · MR24187-S01
YOUR
LOGO
Your Laboratory (Pty) Ltd
Compressive strength of concrete cubes
Client
ABC Construction
Element
Level 2 slab
Class
30 MPa
AgeCubeStrengthResult
7 dS01-A32.4 MPaPass
7 dS01-B33.0 MPaPass
28 dS01-C41.8 MPaPass
04

Your client already has it.

Every client has one link that always shows their latest results. No emails, no WhatsApps, no follow-up calls.

ABC Construction · Client Portal
New result published. No email or WhatsApp needed. It is already here.
MR24187-S01 New
Level 2 slab · 28 day
2 min ago
MR24171-S04 New
Columns C1–C6 · 7 day
Yesterday
MR24152-S02
Raft foundation · 28 day
3 Oct
MR24139-S01
Ground beams · 28 day
29 Sep

And everything around it

Everything else a lab runs on. Already built in.

LabClientsPlantsProjects
Client site
Riverside Towers · Pour 4
Get directions

Operations map

Every lab site, client, plant and project on one map, with one-tap directions from your phone.

Curing tank 2 · now
22.4°C
In range
T1
22.0°
T2
22.4°
T3
21.7°
T4
22.9°

Curing tank monitoring

Tank temperatures logged and charted, so you know every cube cured within spec.

OctoberCast · Test · Report
M
T
W
T
F
S
S
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Lab calendar

Casts, test days and reports due, by day, week or month.

Compression machine
Due Mar
Calibrated
Cube scale
6 days
Due soon
Curing tank 3 probe
Today
Check due
Slump cone set
Due Jun
Calibrated

Equipment & calibration

Machines, scales and probes with calibration records and checks that never slip.

92%
✓Stockpiles labelled
✓Scales calibrated
!Tank temps logged

Plant audits

Guided checklists on site, with a scored report and corrective actions at the end.

MR24187-S01Ready

All checks passed

MR24190-S04Flagged

28-day result below 25 MPa target on cube C. Check before approving.

MR24191-S02Ready

All checks passed

Automated report review

Every report is checked against its targets before sign-off, so nothing odd slips out.

MixUseSets
30 MPa / 19 mmPump mix18
25 MPa / 13 mmSurface bed11
40 MPa / 19 mmColumns7
15 MPa / 26 mmBlinding4

Mix designs

Each client's mixes on file, linked to the jobs and results that use them.

LMTKNSRB+6
Lab managerTechnicianReviewerOfficeClient viewer

Team & roles

The right access for every person, from technician to client.

Built for labs. Growing with the industry.

Explore industries
Available now

Laboratories

Specimens, cube testing, reports and client portals.

Early access

Ready-Mix

Plant audits, fresh concrete records and mix designs.

Coming soon

Construction

Project QA and supplier test results across sites.

Coming soon

Precast

Batch control and product testing before dispatch.

Built inside a working concrete lab. Not a boardroom.

Runs a real lab every day

Cubes received, crushed and reported, live.

Ready-mix already on board

A producer is shaping the ready-mix module today.

Your name on everything

Reports and portals carry your logo and colours.

Concrete's hard enough.Let's make the rest simple.

See Simplecrete on your own workflow in a free, guided demo.